Skip to content
Plumb Right Now

San Antonio, TX

Backflow testing in San Antonio

Updated · Editorial team; not yet technically reviewed

Short answer

San Antonio Water System (SAWS) requires backflow prevention assemblies to be tested every year, with results submitted by June 30. Residential irrigation reminders arrive with bills, and customers who miss the deadline get a 10-day notice before water service can be turned off.

Outdoor faucet dripping water

What's different in San Antonio

  • SAWS customers must have backflow prevention assemblies tested annually and the results submitted by June 30 of each year. [1]

  • The requirement comes from Chapter 24 of the City of San Antonio Plumbing and Fuel Gas Code, Chapter 34 of the City Code of Ordinances, and the SAWS Cross-Connection and Backflow Prevention Control Program. [1]

  • Residential reminders for lawn irrigation backflow testing are sent quarterly with bill notices. [1]

  • Customers without a current-year test report receive a 10-day non-compliance notice, and failure to submit a report within 10 working days may lead to water service being turned off. [2]

The SAWS backflow calendar

Key dates and notices for San Antonio customers
WhenWhat happens
Throughout the yearQuarterly reminders with bill notices for residential irrigation assemblies
By June 30This year's passing test report must be on file with SAWS
After the deadlineA 10-day non-compliance notice is mailed
10 working days after the noticeWater service may be turned off if no report is filed

Why testing in spring makes sense

Scheduling the test in early spring, before the June 30 deadline and the heavy summer watering season, leaves time for repairs and a retest if the assembly fails. Testers get busy close to the deadline. For what a backflow preventer does, the device types and how a test works anywhere, see backflow testing.

Further reading: How backflow happens and which devices homes use.

Common questions

When is the SAWS backflow test due?

Every year by June 30.

Why does SAWS require annual backflow testing?

It's required by the City of San Antonio Plumbing and Fuel Gas Code, the City Code of Ordinances and SAWS's cross-connection control program.

What is a SAWS 10-day notice about backflow?

It means SAWS has no test report for the current year. You have 10 working days to submit one before water service may be turned off.

Will SAWS remind me about my sprinkler backflow test?

Yes. Residential irrigation reminders are sent quarterly with bill notices.

Can SAWS shut off water for a missing backflow test?

Yes, if a report isn't submitted within 10 working days of the non-compliance notice.

When should I book my San Antonio backflow test?

In early spring, so there's time for repairs and a retest before June 30.

Does a failed test count toward the June 30 deadline?

No. The assembly must be repaired and pass a retest, and the passing report must be on file.

Who files my San Antonio backflow test results?

The certified tester who performs the test submits the test and maintenance report.

What backflow device is on most San Antonio sprinkler systems?

Residential irrigation systems commonly use a pressure vacuum breaker or a double check assembly, depending on the installation and code requirements.

Who can repair a San Antonio backflow assembly?

A certified tester or licensed plumber can repair it; then it must be retested.

More plumbing help in San Antonio

How other cities handle it

Sources (2)
  1. SAWS, Annual Testing of Backflow Prevention Assemblies · checked 2026-10-03
  2. SAWS, 10-Day Notification Letters FAQs · checked 2026-10-03
Call for Plumbing Help