Raleigh, NC
Backflow testing in Raleigh
Updated · Editorial team; not yet technically reviewed
Short answer
In Raleigh, residential irrigation backflow containment assemblies must be tested by July 1 every three years, while commercial irrigation assemblies are tested every year by July 1. Testing is done by a certified tester at the customer's expense, and the owner must keep the assembly working.

What's different in Raleigh
All residential irrigation containment assemblies in Raleigh must be tested by July 1 every three years. [1]
Containment assemblies on commercial irrigation systems in Raleigh must be tested annually by July 1. [1]
Testing is done by a certified tester at the customer's expense, and the owner must make repairs to keep the assembly fully operational; the Director of Public Utilities may impose additional requirements. [2]
Raleigh Public Utilities' Cross Connection team is reachable at (919) 996-3245 or [email protected], weekdays 8 a.m. to 3:30 p.m. [1]
Is this your test year?
Raleigh's residential irrigation cycle is three years, so your due year depends on when your assembly was last tested. If you've just bought a home with a sprinkler system, ask the seller for the last report or call the Cross Connection team to find your cycle before July 1.
Getting it done before July 1
Confirm your cycle
Check the last test date or ask Raleigh's Cross Connection team.
Book a certified tester in spring
You pay for the test; spring booking avoids the June rush.
Repair if needed
Owners must keep the assembly fully operational, so failed parts are replaced and the device retested.
Raleigh summers and irrigation wear
Raleigh lawns are watered hard through hot, humid summers, and three years is a long time for rubber seals to sit under pressure. If your assembly drips, discharges or loses pressure between tests, have it serviced rather than waiting for the July 1 cycle. Our backflow testing page explains how each device type works and fails.
Further reading: How backflow happens and which devices homes use.
Common questions
When is Raleigh's backflow test deadline?
July 1. Residential irrigation assemblies are due every three years; commercial irrigation every year.
How do I know if my Raleigh backflow test is due this year?
Check your last test date or contact Raleigh's Cross Connection team at (919) 996-3245.
Who pays for backflow testing in Raleigh?
The customer pays for testing by a certified tester.
Do I have to repair a failed backflow assembly in Raleigh?
Yes. Owners must keep the assembly fully operational, so repairs and a retest are required.
Does Raleigh test commercial irrigation more often?
Yes, commercial irrigation containment assemblies are tested annually by July 1.
What hours can I call Raleigh about backflow?
The Cross Connection team takes calls weekdays from 8 a.m. to 3:30 p.m.
I just bought a Raleigh home with sprinklers. What should I do?
Find out when the backflow assembly was last tested so you know your three-year cycle.
Can Raleigh require extra backflow testing?
Yes, the Director of Public Utilities can impose additional testing and maintenance requirements.
Do towns near Raleigh like Apex follow this schedule?
Towns with their own water systems, such as Apex, run their own backflow programs.
How do I email Raleigh's backflow team?
More plumbing help in Raleigh
- Sewer Line Repair in RaleighRaleigh sewer laterals: the owner's line runs from the house to the city main, the city fixes main breaks in the street, common causes, and the 24/7 overflow line.
- Backflow Testing: the full guideWhat backflow is, which homes and businesses need backflow preventers, how annual backflow testing works, and what happens if a device fails.
- Plumbing in RaleighLocal water, housing and climate conditions, and the calls Raleigh homes need most.
How other cities handle it
- Backflow testing in AustinAustin Water's backflow testing rules: who may test, the 5-day report deadline, online filing, and the irrigation rebates that pair with an upgrade.
- Backflow testing in San AntonioSAWS backflow testing rules for San Antonio: the June 30 annual deadline, the codes behind it, reminder notices, and what a 10-day notice means.
- Backflow testing in DenverDenver Water's backflow rules: annual testing, the May–September irrigation testing season, required device types, 30-day reminders, and where results go.
- Backflow testing in SeattleSeattle Public Utilities backflow testing rules: annual tests by your anniversary date, Washington-certified testers, reporting, and non-compliance charges.
- Backflow testing in PortlandPortland Water Bureau backflow rules: yearly testing by a state-certified tester, the spring timing it prefers, reminder letters with labels, and shutoff risk.
- Backflow testing in CharlotteCharlotte Water backflow rules: residential irrigation tested every 3 years, residential domestic yearly, approved testers, and RP assemblies on irrigation.
- Backflow testing in TampaCity of Tampa Water Department backflow rules: residential tests every two years, commercial yearly, certified technicians, and the 7-day online reporting rule.
- Backflow testing in Salt Lake CitySalt Lake City Public Utilities backflow rules: tests within 10 days of installation and yearly after, which homes need protection, and secondary water.
- Backflow testing in Colorado SpringsColorado Springs Utilities backflow rules: who must test annually, the July 1 deadline, the $405 fine, licensed testers entering results, and single-family guidance.
- Backflow testing in Fort WorthFort Worth backflow rules: annual tests for commercial and health-hazard assemblies, a three-year cycle for low-hazard irrigation, and registered testers.
- Backflow testing for JEA customers in JacksonvilleJEA residential backflow rules: testing at least every two years by JEA Qualified Vendors, dual checks replaced every five years, and reclaimed-water irrigation.
- Backflow testing in Fort LauderdaleFort Lauderdale backflow rules: residential irrigation tested every two years, commercial yearly, only PVB or RP devices on irrigation meters, and certified testers.
- Backflow testing in DallasDallas backflow rules: lawn irrigation assemblies don't need annual tests, only when new, repaired or replaced; high-hazard assemblies need annual registered tests.
- Backflow testing in HoustonHouston backflow testing: testing companies must register with the city, testers need TCEQ licenses, and gauges need annual calibration reports filed with Houston.
- Backflow testing in PhoenixPhoenix backflow rules: assemblies tested at least yearly, 60 days to test after the reminder letter, then a 72-hour disconnection notice. Who needs one at home.
- Backflow testing in PhiladelphiaPWD backflow rules: test at installation, after any repair and yearly by a City-certified technician, file Form 79-770 within 48 hours.
Sources (2)
- City of Raleigh, Backflow Testing Schedule · checked 2026-10-03
- City of Raleigh, Backflow Frequently Asked Questions · checked 2026-10-03
